Engineering, Procurement and  Installation of several sizes of the piping in the Petrochemical/Utility  stations and plants in Doha,Dukhan, Mesaieed and Ras Laffan

The scope of works covers,

  • Engineering
  • Procurement
  • Civil Works
  • Fabrication, Installation and Testing and commissioning of piping works in the different stations
  • Tie-in of the new facilities to the existing facilities
  • Pre-commissioning and Commissioning of Piping and associated equipments.

Related Projects

Project Title : EPIC for Mitigation of Burn pits & Demolition of Redundant Pipelines & Telecom Repeater Station
Client : Qatar Petroleum
Contract No. : GC12107400
Status : Ongoing
Scope : Various 1” to 36” Piping works

Project Title : EPIC for Feed Stream Integration and Installation of Fiscal Metering System at Mesaieed
Client : Qatar Petroleum
Contract No. : GC12113600
Status : Ongoing
Project Scope : Various 1” to 24” ( 6 KM) Piping works

Project Title : Epic FOR Mechanical PCR’s Within Dukhan Fields
Client : Qatar Petroleum
Contract No. : GC101057100
Status : Completed (2013)
Scope : Various ½” to 2½” Piping works

Project Title : EPIC for Creation of Additional Slots Manifold at FNDS
Client : Qatar Petroleum
Contract No. : GT08108100
Status : Completed (2010)
Project Scope : Various 1” to 18” Piping works

Project Title : Award of Work Change Request (WCR) No.6 EPIC of Flash Gas/SAG Pipeline Between FSP and FMDS.
Client : Qatar Petroleum
Contract No. : GTC 06/107/ED (GC06010700)
Status : Completed (2009)
Scope : Various 1” to 24” Piping works

Project Title : EPIC for upgrade of Fire Water Ring Main Systems at Khatiya Main, Fahahil Main, Jaleha and Diyab – Dukhan.
Client : Qatar Petroleum
Contract No. : GTC 07/109/ED
Status : Completed (2009)
Scope : GRE Piping, various 1“ to 4” Piping works

Project Title : Engineering, Procurement, Installation and Commissioning of an Independent Flare for QJA-1 & 2 and Replacement of Separators at Dukhan Field
Client : Qatar Petroleum
Contract No. : GTC 189/ED/03
Status : Completed (2006)
Project Scope : Various 1” to 36” Piping works

Project Title : EPIC of the Interim Rag Diversion Dukhan.
Client : Qatar Petroleum
Contract No. : GTC 189/ED/03/VTC#1
Status : Completed (2006)
Scope : Dia 24” X 28mm Thickness Piping works

Project Title : Replacement of 10” Fuel Gas Pipeline with 6” Pipeline in the Dukhan Field.
Client : Qatar Petroleum
Contract No. : GTC/04/185/FSD/04
Status : Completed (2004)
Scope : Various 1” to 12” Piping works

Project Title : Engineering, Supply, Fabrication, Installation & Commissioning of 8” GRE Fire Piping System with 2 Nos. Hydrants and Remote Operated Monitors – E 11098
Client : Future Pipe / QAFCO
Status : Completed (2002)
Scope : 8” GRE Piping works

Project Title : Civil Works (Fabrication & Installation of Pipe Supports) & Station Piping Work for Station S2.
Client : QGPC(ZPEB)
Contract No. : GTC 155/99
Status : Completed (2001)
Scope : Various sizes Piping works