Engineering, Procurement, Installation and Commissioning of several sizes of the Above Ground and Under ground cross  Country Pipelines  for the transmission of Oil & Gas in petrochemical plants and transmission of Fire water and portable water for the Utility service in and around the Dukhan filed & Mesaieed plants.

The scope of works covers,

  • Engineering
  • Procurement
  • Civil Works
  • Fabrication, Installation and Testing of Commisioning piping works in the different stations
  • Manufacturing and Installation of pipeline equipment such as Pig Launchers and receivers, Slug catchers, Separators, Pressure vessels, Corrosion monitoring system, Cathodic protection systems etc….
  • Installation,Testing and commissioning of Above- Ground & Under Ground Cross country pipelines
  • Installation,Testing and commissioning of Loss Prevention equipments such as F & G system Deluge system and Fire fighting system
  • Blasting and Painting
  • Installation and commissioning of E & I systems such as DCS system, ESD system, Fire & Gas system, HIIPS system etc…
  • Pipeline MFL survey (Intelligent Pigging)

Related Projects

Project Title : EPIC for Installation of 20” Wet Gas Pipeline Between KS & KM
Client : Qatar Petroleum
Contract No. : GC 12107100
Status : Ongoing
Scope : 20” dia,4.3 KM length Pipeline with 1 major Highway Crossing by means of HDD

Project Title : Award of Work Change Request (WCR) No.6 EPIC of Flash Gas/SAG Pipeline Between FSP and FMDS.
Client : Qatar Petroleum
Contract No. : GTC 06/107/ED (GC06010700)
Status : Completed (2009)
Scope : 12” dia,4.5 KM length Pipeline.

Project Title : EPIC of Replacement of a Section of the Existing 12” Condensate Line Between Arab D and Mesaieed
Client : Qatar Petroleum
Contract No. : GTC06/107/ED VTC#1
Status : Completed (2007)
Scope : 12” Dia, 5 KM length Pipeline.

Project Title : EPIC for Replacement of Existing 3” LPG Line From QAPCO to NGL-1/NGL-2 Plants.
Client : Qatar Petroleum
Contract No. : GTC05/229/ED VTC#1
Status : Completed (2010)
Scope : 4” dia, 9 KM length Pipeline.

Project Title : EPIC of New Condensate Tank (T-13) AT NGL Plants Mesaieed
Client : Galfar Al-Misnad
Contract No. : GTC05/119/ED
Status : Completed (2008)
Scope : 4” dia, 150 Joints Pipeline.

Project Title : EPIC for Supply of Fuel Gas for QNCC Expansion Project No -3
Client : Qatar Petroleum
Contract No. : GTC 150/ED/03 VTC #4
Status : Completed (2007)
Scope : 12” dia, 8 KM length Pipeline.

Project Title : EPIC for Pigging Facilities Modifications on 24″, 18″ & 16″ SAG Pipelines and LBV’s Installation on 16″ & 18″ Pipelines in the Dukhan Field
Client : Qatar Petroleum
Contract No. : GTC 05/169/FSD
Status : Completed (2006)
Scope : 12” dia, 8 KM length Pipeline

Project Title : Replacement of 10” Fuel Gas Pipeline with 6” Pipeline in the Dukhan Field.
Client : Qatar Petroleum
Contract No. : GTC/04/185/FSD/04
Status : Completed (2004)
Scope : 6” dia, 7 KM length Pipeline

Project Title : EPIC of 12” Oil & Gas Pipeline Replacement Project, QNCC Quarry Dukhan
Client : Qatar Petroleum
Contract No. : GTC/150/ED/03
Status : Completed (2004)
Scope : 12” dia, 17 KM length Pipeline

Project Title : 12” Crossover Pipeline for conservation of North Field Excess Gas by Injection into Arab D.
Client : QGPC (Essar Oil)
Contract No. : GTC – 120/99
Status : Completed (2000)
Scope : 12” dia, 28mm Thickness 5 KM length Pipeline

Project Title : Installation of Pipeline under the bridge in West Bay Lagoon
Client : Ministry of Municipal Affairs & Agriculture (HBK)
Status : Completed (1999)
Scope : 8” & 10” dia, 1 KM length Pipelines

pipelines-1